ITAC Assessment: TT0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Hardwood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range less than $500
k
# of Employees 350
Plant Area 80,000
ft2
Annual Production 25,000
thousand feet
Production Hrs. Annual 4,500
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $776,710 17,647,764
kWh
Electricity Demand $261,569 43,096
kW-mo/yr
Electricity Fees $111,502 -
Natural Gas $19,649 18,984
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,636 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,170

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $17,837 - $14,837
337,209
kWh
$3,000
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,496 $57,000 $12,026
273,312
kWh
$450
-
kW-mo/yr
$3,020 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,704 $7,000 $5,304
120,537
kWh
$200
-
kW-mo/yr
$1,200 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,906 $10,250 $2,606
59,217
kWh
$100
-
kW-mo/yr
$1,200 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,681 $5,100 $2,981
67,758
kWh
$100
-
kW-mo/yr
$600 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,851 $10,200 $1,591
36,161
kWh
$60
-
kW-mo/yr
$1,200 - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,170 $2,500 $3,170
72,054
kWh
- - - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,246 $800 $1,246
28,309
kWh
- - - -
09 2.4322: Use or replace with energy efficient substitutes $880 $1,600 - - - - $880
10 2.2443: Re-use or recycle hot or cold process exhaust air $865 $1,730 - - - $865
-
MMBtu
-
TOTAL RECOMMENDED $56,636 $96,180 $43,761
994,557
kWh
$3,910
-
kW-mo/yr
$7,220 $865
-
MMBtu
$880
TOTAL IMPLEMENTED $3,170 $2,500 $3,170
72,054
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs