17
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Sawmills and planing mills, general | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CO0524 #10 Y:2003 | 10 | 2003 | Disconnect ballasts | $560 | $330 | |
| CO0524 #09 Y:2003 | 09 | 2003 | Utilize higher efficiency lamps and/or ballasts | $164 | $546 | |
| CO0524 #08 Y:2003 | 08 | 2003 | Utilize higher efficiency lamps and/or ballasts | $394 | $1,644 | |
| CO0524 #07 Y:2003 | 07 | 2003 | Install timers on light switches in little used areas | $660 | $210 | |
| CO0524 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,602 | $5,894 | |
| CO0524 #05 Y:2003 | 05 | 2003 | Use photocell controls | $2,090 | $1,080 | |
| CO0524 #04 Y:2003 | 04 | 2003 | Utilize energy-efficient belts and other improved mechanisms | $3,360 | $8,160 | |
| CO0524 #03 Y:2003 | 03 | 2003 | Use most efficient type of electric motors | $821 | $3,286 | |
| CO0524 #02 Y:2003 | 02 | 2003 | Utilize higher efficiency lamps and/or ballasts | $4,400 | $11,160 | |
| CO0524 #01 Y:2003 | 01 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,560 | $770 | |
| CO0078 #07 Y:1986 | 07 | 1986 | Redesign process | $112,427 | $120,000 | |
| CO0078 #06 Y:1986 | 06 | 1986 | Replace electrically-operated equipment with fossil fuel equipment | $1,730 | $1,000 | |
| CO0078 #05 Y:1986 | 05 | 1986 | Install compressor air intakes in coolest locations | $4,242 | $300 | |
| CO0078 #04 Y:1986 | 04 | 1986 | Utilize energy-efficient belts and other improved mechanisms | $20,746 | $3,000 | |
| CO0078 #03 Y:1986 | 03 | 1986 | Eliminate leaks in inert gas and compressed air lines/ valves | $19,055 | $1,000 | |
| CO0078 #02 Y:1986 | 02 | 1986 | Optimize plant power factor | $6,480 | $2,459 | |
| CO0078 #01 Y:1986 | 01 | 1986 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $20,490 | $100,000 |