ITAC Assessment: CO0078
ITAC logo
ITAC Assessment: CO0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product STUD BOARD
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 52,600
thousand feet
Production Hrs. Annual 5,313
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,000 5,444,021
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $20,490 $100,000 $23,080
531,360
kWh
- $(-2,590.0)
-
MMBtu
02 2.3212: Optimize plant power factor $6,480 $2,459 $6,480
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,055 $1,000 $19,055
262,896
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,746 $3,000 $20,746
286,049
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $4,242 $300 $4,242
58,617
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,730 $1,000 $2,259
31,067
kWh
$(-529.0)
-
MMBtu
-
07 2.5194: Redesign process $112,427 $120,000 $112,427
1,550,703
kWh
- -
TOTAL RECOMMENDED $185,170 $227,759 $188,289
2,720,692
kWh
$(-529.0)
-
MMBtu
$(-2,590.0)
-
MMBtu
TOTAL IMPLEMENTED $50,523 $6,759 $50,523
607,562
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs