Assessment Year | 1986 |
---|---|
Principal Product | STUD BOARD |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 52,600
thousand feet
|
Production Hrs. Annual | 5,313
hrs
|
Location (State) | Wyoming |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $400,000 | 5,444,021 |
kWh
|
$0.073 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,170 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,523 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $20,490 | $100,000 |
$23,080
531,360
kWh
|
- |
$(-2,590.0)
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $6,480 | $2,459 |
$6,480
-
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,055 | $1,000 |
$19,055
262,896
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $20,746 | $3,000 |
$20,746
286,049
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,242 | $300 |
$4,242
58,617
kWh
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,730 | $1,000 |
$2,259
31,067
kWh
|
$(-529.0)
-
MMBtu
|
- | |
07 | 2.5194: Redesign process | $112,427 | $120,000 |
$112,427
1,550,703
kWh
|
- | - | |
TOTAL RECOMMENDED | $185,170 | $227,759 |
$188,289
2,720,692
kWh
|
$(-529.0)
-
MMBtu
|
$(-2,590.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $50,523 | $6,759 |
$50,523
607,562
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs