Assessment Year | 2003 |
---|---|
Principal Product | Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
116,800
ft2
|
Annual Production | 36,957,000
thousand feet
|
Production Hrs. Annual | 6,006
hrs
|
Location (State) | Wyoming |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $372,646 | 12,088,221 |
kWh
|
$0.031 |
Electricity Demand | $172,764 | 28,432 |
kW-mo/yr
|
$6.08 |
Electricity Fees | $(-156.0) | - |
|
- |
LPG | $5,504 | 623 |
MMBtu
|
$8.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,127 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,560 | $770 |
$7,780
420,200
kWh
|
$3,500
-
kW-mo/yr
|
$(-720.0) | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,400 | $11,160 |
$2,100
113,100
kWh
|
$1,500
-
kW-mo/yr
|
- | $800 | |
03 | 2.4133: Use most efficient type of electric motors | $821 | $3,286 |
$467
25,190
kWh
|
$354
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,360 | $8,160 |
$1,810
97,700
kWh
|
$1,550
-
kW-mo/yr
|
- | - | |
05 | 2.7134: Use photocell controls | $2,090 | $1,080 |
$970
52,700
kWh
|
$800
-
kW-mo/yr
|
- | $320 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,602 | $5,894 |
$1,044
56,520
kWh
|
$680
-
kW-mo/yr
|
- | $(-122.0) | |
07 | 2.7132: Install timers on light switches in little used areas | $660 | $210 |
$320
17,500
kWh
|
$260
-
kW-mo/yr
|
- | $80 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $394 | $1,644 |
$350
19,006
kWh
|
$216
-
kW-mo/yr
|
- | $(-172.0) | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $164 | $546 |
$142
2,932
kWh
|
- | - | $22 | |
10 | 2.7122: Disconnect ballasts | $560 | $330 |
$190
10,500
kWh
|
$330
-
kW-mo/yr
|
- | $40 | |
TOTAL RECOMMENDED | $24,611 | $33,080 |
$15,173
815,348
kWh
|
$9,190
-
kW-mo/yr
|
$(-720.0) | $968 | ||
TOTAL IMPLEMENTED | $16,127 | $12,884 |
$10,931
591,116
kWh
|
$5,810
-
kW-mo/yr
|
$(-720.0) | $106 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs