ITAC Assessment: CO0524
ITAC logo
ITAC Assessment: CO0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 116,800
ft2
Annual Production 36,957,000
thousand feet
Production Hrs. Annual 6,006
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $372,646 12,088,221
kWh
Electricity Demand $172,764 28,432
kW-mo/yr
Electricity Fees $(-156.0) -
LPG $5,504 623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,560 $770 $7,780
420,200
kWh
$3,500
-
kW-mo/yr
$(-720.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,400 $11,160 $2,100
113,100
kWh
$1,500
-
kW-mo/yr
- $800
03 2.4133: Use most efficient type of electric motors $821 $3,286 $467
25,190
kWh
$354
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,360 $8,160 $1,810
97,700
kWh
$1,550
-
kW-mo/yr
- -
05 2.7134: Use photocell controls $2,090 $1,080 $970
52,700
kWh
$800
-
kW-mo/yr
- $320
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,602 $5,894 $1,044
56,520
kWh
$680
-
kW-mo/yr
- $(-122.0)
07 2.7132: Install timers on light switches in little used areas $660 $210 $320
17,500
kWh
$260
-
kW-mo/yr
- $80
08 2.7142: Utilize higher efficiency lamps and/or ballasts $394 $1,644 $350
19,006
kWh
$216
-
kW-mo/yr
- $(-172.0)
09 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $546 $142
2,932
kWh
- - $22
10 2.7122: Disconnect ballasts $560 $330 $190
10,500
kWh
$330
-
kW-mo/yr
- $40
TOTAL RECOMMENDED $24,611 $33,080 $15,173
815,348
kWh
$9,190
-
kW-mo/yr
$(-720.0) $968
TOTAL IMPLEMENTED $16,127 $12,884 $10,931
591,116
kWh
$5,810
-
kW-mo/yr
$(-720.0) $106
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs