Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Automotive trimmings, apparel findings, and related products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0014 #09 Y:2022 Recover waste heat from equipment $91 $261
MU0014 #08 Y:2022 Turn off equipment when not in use $109 -
MU0014 #07 Y:2022 Turn off equipment when not in use $414 $349
MU0014 #06 Y:2022 Use optimum temperature $1,469 $155
MU0014 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,680 $4,307
MU0014 #04 Y:2022 Clean and maintain refrigerant condensers and towers $6,530 -
MU0014 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $8,023 -
MU0014 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $19,203 $4,540
MU0014 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $32,107 $30,064
CC0003 #04 Y:2022 Install timers and/or thermostats $5,980 -
CC0003 #03 Y:2022 Turn off equipment when not in use $990 -
CC0003 #02 Y:2022 Reduce illumination to minimum necessary levels $1,633 -
CC0003 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $23,652 $12,041
AM0795 #05 Y:2019 Pay utility bills on time $1,105 -
AM0795 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $710 $284
AM0795 #03 Y:2019 Reduce the pressure of compressed air to the minimum required $1,710 $18
AM0795 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,426 $1,000
AM0795 #01 Y:2019 Turn off equipment when not in use $3,600 $35
TR0021 #04 Y:2019 Reschedule plant operations or reduce load to avoid peaks $3,409 -
TR0021 #03 Y:2019 Use mechanical stripping methods $2,731 $666