Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Women's, misses', and juniors' suits, skirts, and coats
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0471 #06 Y:1992 Install compressor air intakes in coolest locations $328 $185
TN0471 #05 Y:1992 Reduce the pressure of compressed air to the minimum required $492 -
TN0471 #04 Y:1992 Insulate bare equipment $262 $90
TN0471 #03 Y:1992 Utilize higher efficiency lamps and/or ballasts $1,938 $1,124
TN0471 #02 Y:1992 Install / repair insulation on condensate lines $3,595 $2,674
TN0471 #01 Y:1992 Keep lamps and reflectors clean $15,959 $10,815
TN0452 #07 Y:1991 Utilize higher efficiency lamps and/or ballasts $1,088 $609
TN0452 #06 Y:1991 Conserve energy by efficient use of vending machines $884 $1,015
TN0452 #05 Y:1991 Insulate bare equipment $490 $182
TN0452 #04 Y:1991 Lower temperature during the winter season and vice-versa $2,268 -
TN0452 #03 Y:1991 Utilize energy-efficient belts and other improved mechanisms $2,409 $4,375
TN0452 #02 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $1,135 $380
TN0452 #01 Y:1991 Keep lamps and reflectors clean $7,540 $23,120
KU0240 #04 Y:1987 Insulate bare equipment $149 $42
KU0240 #03 Y:1987 Install turbulators $618 $584
KU0240 #02 Y:1987 Analyze flue gas for proper air/fuel ratio $953 -
KU0240 #01 Y:1987 Utilize higher efficiency lamps and/or ballasts $2,996 $4,437
TN0278 #06 Y:1986 Install / repair insulation on condensate lines $348 $68
TN0278 #05 Y:1986 Use minimum steam operating pressure $382 -
TN0278 #04 Y:1986 Insulate bare equipment $590 $682