ITAC Assessment: TN0471
ITAC logo
ITAC Assessment: TN0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product UNIFORMS
NAICS
n/a
SIC 2337: Women's, Misses', and Juniors' Suits, Skirts, and Coats
Sales Range $5
M
to 10
M
# of Employees 307
Plant Area
n/a
Annual Production 700,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,985 1,320,047
kWh
Fuel Oil #2 $12,776 2,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,574 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $15,959 $10,815 $14,279
254,982
kWh
- $1,680
02 2.2122: Install / repair insulation on condensate lines $3,595 $2,674 - $3,595
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,938 $1,124 $2,610
46,600
kWh
- $(-672.0)
04 2.2511: Insulate bare equipment $262 $90 - $262
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $492 - $492
8,792
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $328 $185 $328
5,862
kWh
- -
TOTAL RECOMMENDED $22,574 $14,888 $17,709
316,236
kWh
$3,857
-
MMBtu
$1,008
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs