Assessment Year | 2016 |
---|---|
Principal Product | Sub assembly logistics |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 339 |
Plant Area |
1,342,569
ft2
|
Annual Production | 2,375,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $435,229 | 9,347,193 |
kWh
|
$0.047 |
Electricity Demand | $395,131 | 17,292 |
kW-mo/yr
|
$22.85 |
Electricity Fees | $5,012 | - |
|
- |
Natural Gas | $303,416 | 45,614 |
MMBtu
|
$6.65 |
TOTAL YEARLY COSTS | $1,138,788 | |||
RECOMMENDED SAVINGS* | $275,806 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,793 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $114,753 | - |
$1,198
34,588
kWh
|
$119,036
-
kW-mo/yr
|
- |
$(-5,481.0)
-
MMBtu
|
- | |
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $19,894 | $39,000 |
$16,449
475,000
kWh
|
$24,372
-
kW-mo/yr
|
$(-20,927.0)
-
MMBtu
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $18,841 | - |
$116
3,345
kWh
|
$19,188
-
kW-mo/yr
|
- | - | $(-463.0) | |
04 | 2.4322: Use or replace with energy efficient substitutes | $12,612 | $68,240 |
$5,804
167,607
kWh
|
$6,808
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $14,215 | $15,000 |
$(-53.0)
(-1,538)
kWh
|
$(-25.0)
-
kW-mo/yr
|
$14,293
-
MMBtu
|
- | - | |
06 | 2.4226: Use / purchase optimum sized compressor | $11,843 | - |
$11,843
342,000
kWh
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $5,881 | $10,000 |
$3,200
92,399
kWh
|
$2,681
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,551 | $1,000 |
$844
24,360
kWh
|
$707
-
kW-mo/yr
|
- | - | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $78 | - |
$29
850
kWh
|
$49
-
kW-mo/yr
|
- | - | - | |
10 | 2.7314: Reduce ventilation air | $19,897 | $10,500 |
$1,542
44,535
kWh
|
$280
-
kW-mo/yr
|
$18,075
-
MMBtu
|
- | - | |
11 | 2.7231: Use radiant heater for spot heating | $6,411 | $23,750 |
$512
14,777
kWh
|
- |
$5,899
-
MMBtu
|
- | - | |
12 | 2.7224: Reduce space conditioning during non-working hours | $5,300 | - | - | - |
$5,300
-
MMBtu
|
- | - | |
13 | 2.7135: Install occupancy sensors | $14,374 | $25,987 |
$11,923
344,310
kWh
|
- | - | - | $2,451 | |
14 | 2.7111: Reduce illumination to minimum necessary levels | $1,523 | $139 |
$725
20,939
kWh
|
$695
-
kW-mo/yr
|
- | - | $103 | |
15 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,991 | $14,214 |
$2,677
77,312
kWh
|
$2,151
-
kW-mo/yr
|
- | - | $(-837.0) | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,642 | $41,348 |
$12,631
364,756
kWh
|
$12,105
-
kW-mo/yr
|
- | - | $(-94.0) | |
TOTAL RECOMMENDED | $275,806 | $249,178 |
$69,440
2,005,240
kWh
|
$188,047
-
kW-mo/yr
|
$22,640
-
MMBtu
|
$(-5,481.0)
-
MMBtu
|
$1,160 | ||
TOTAL IMPLEMENTED | $21,793 | $24,214 |
$17,749
512,561
kWh
|
$4,881
-
kW-mo/yr
|
- | - | $(-837.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #1 Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs