Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Women's, misses', and juniors' dresses
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0254 #07 Y:1999 Replace existing equipment with more suitable substitutes $535 $3,800
MO0254 #06 Y:1999 Replace existing equipment with more suitable substitutes $378 $624
MO0254 #05 Y:1999 Use a different or recycled raw material $1,320 $3,300
MO0254 #04 Y:1999 Lease / purchase baler; sell cardboard to recycler $5,290 -
MO0254 #03 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $13,160 $26,000
MO0254 #02 Y:1999 Utilize higher efficiency lamps and/or ballasts $2,096 $991
MO0254 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $8,319 $24,516
TN0550 #05 Y:1995 Utilize energy-efficient belts and other improved mechanisms $158 $1,000
TN0550 #04 Y:1995 Utilize higher efficiency lamps and/or ballasts $702 $334
TN0550 #03 Y:1995 Install spectral reflectors / delamp $401 -
TN0550 #02 Y:1995 Reduce the pressure of compressed air to the minimum required $970 $620
TN0550 #01 Y:1995 Install timers and/or thermostats $1,688 $800
TN0365 #13 Y:1988 Change rate schedules or other changes in utility service $2,286 -
TN0365 #12 Y:1988 Conserve energy by efficient use of vending machines $157 $385
TN0365 #11 Y:1988 Install / repair insulation on condensate lines $38 $30
TN0365 #10 Y:1988 Utilize higher efficiency lamps and/or ballasts $1,100 $616
TN0365 #09 Y:1988 Utilize energy-efficient belts and other improved mechanisms $294 -
TN0365 #08 Y:1988 Reduce the pressure of compressed air to the minimum required $334 $250
TN0365 #07 Y:1988 Analyze flue gas for proper air/fuel ratio $95 $1,700
TN0365 #06 Y:1988 Close off unneeded steam lines $118 $210