ITAC Assessment: MO0254
ITAC logo
ITAC Assessment: MO0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Women's Clothing
NAICS
n/a
SIC 2335: Women's, Misses', and Juniors' Dresses
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 110,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 2,366
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,884 1,558,031
kWh
Electricity Demand $50,015 587
kW-mo/yr
Electricity Fees $23,154 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,110

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,319 $24,516 $4,828
95,545
kWh
$3,491
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,096 $991 $1,244
24,619
kWh
$852
-
kW-mo/yr
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,160 $26,000 $14,810
293,083
kWh
$5,850
-
kW-mo/yr
$(-7,500.0)
-
MMBtu
- -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $5,290 - - - - $5,290
-
lb
-
05 3.1175: Use a different or recycled raw material $1,320 $3,300 - - - $1,320
-
lb
-
06 4.652: Replace existing equipment with more suitable substitutes $378 $624 - - - - $378
07 4.652: Replace existing equipment with more suitable substitutes $535 $3,800 - - - - $535
TOTAL RECOMMENDED $31,098 $59,231 $20,882
413,247
kWh
$10,193
-
kW-mo/yr
$(-7,500.0)
-
MMBtu
$6,610
-
lb
$913
TOTAL IMPLEMENTED $24,110 $55,307 $20,882
413,247
kWh
$10,193
-
kW-mo/yr
$(-7,500.0)
-
MMBtu
- $535
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs