ITAC Assessment: UF0451
ITAC logo
ITAC Assessment: UF0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product ammunition and pyrotechnics
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 100,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,800
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,863 4,102,800
kWh
Electricity Demand $66,769 9,537
kW-mo/yr
Natural Gas $136,572 76,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,603

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,739 - $1,681
20,013
kWh
$782
-
kW-mo/yr
- $420 $2,856
02 2.4225: Install common header on compressors $8,773 $222 $8,773
104,440
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,497 - $3,381
40,261
kWh
$116
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,153 $1,277 $1,153
11,417
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,440 $3,310 $2,710
32,256
kWh
$730
-
kW-mo/yr
- - -
06 2.7124: Make a practice of turning off lights when not needed $498 - $498
5,928
kWh
- - - -
07 2.2521: Isolate steam lines to avoid heating air conditioned areas $1,379 $1,140 - - $1,379
-
MMBtu
- -
08 2.2515: Use optimum thickness insulation $1,327 $1,865 $1,327
13,140
kWh
- - - -
TOTAL RECOMMENDED $25,806 $7,814 $19,523
227,455
kWh
$1,628
-
kW-mo/yr
$1,379
-
MMBtu
$420 $2,856
TOTAL IMPLEMENTED $19,603 $4,809 $14,815
174,054
kWh
$1,512
-
kW-mo/yr
- $420 $2,856
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs