16
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0033 #08 Y:2008 | 08 | 2008 | Use plant owned transformers or lease transformers | $6,433 | $26,980 | |
| DL0033 #07 Y:2008 | 07 | 2008 | Install compressor air intakes in coolest locations | $310 | $150 | |
| DL0033 #06 Y:2008 | 06 | 2008 | Upgrade controls on compressors | $3,596 | $12,500 | |
| DL0033 #05 Y:2008 | 05 | 2008 | Utilize higher efficiency lamps and/or ballasts | $580 | $80 | |
| DL0033 #04 Y:2008 | 04 | 2008 | Analyze flue gas for proper air/fuel ratio | $4,737 | $10,000 | |
| DL0033 #03 Y:2008 | 03 | 2008 | Use adjustable frequency drive or multiple speed motors on existing system | $8,789 | $16,100 | |
| DL0033 #02 Y:2008 | 02 | 2008 | Avoid introducing hot, humid, or dirty air into hvac system | $5,409 | $9,300 | |
| DL0033 #01 Y:2008 | 01 | 2008 | Use minimum steam operating pressure | $1,091 | - | |
| LE0153 #08 Y:2003 | 08 | 2003 | Reduce illumination to minimum necessary levels | $1,976 | $877 | |
| LE0153 #07 Y:2003 | 07 | 2003 | Install occupancy sensors | $766 | $75 | |
| LE0153 #06 Y:2003 | 06 | 2003 | Keep doors and windows shut when not on use | $4,948 | $1,000 | |
| LE0153 #05 Y:2003 | 05 | 2003 | Analyze flue gas for proper air/fuel ratio | $4,189 | $750 | |
| LE0153 #04 Y:2003 | 04 | 2003 | Preheat combustion air with waste heat | $2,432 | $1,500 | |
| LE0153 #03 Y:2003 | 03 | 2003 | Insulate bare equipment | $19,979 | $7,500 | |
| LE0153 #02 Y:2003 | 02 | 2003 | Use properly designed and sized hvac equipment | $4,007 | $4,000 | |
| LE0153 #01 Y:2003 | 01 | 2003 | Add area lighting switches | $3,181 | $1,375 |