15
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Weft knit fabric mills | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NC0666 #04 Y:2021 | 04 | 2021 | Use heat from boiler blowdown to preheat boiler feed water | $4,768 | $10,000 |
n/a
|
NC0666 #03 Y:2021 | 03 | 2021 | Reduce the pressure of compressed air to the minimum required | $2,259 | $50 |
n/a
|
NC0666 #02 Y:2021 | 02 | 2021 | Size electric motors for peak operating efficiency | $24,876 | $50,000 |
n/a
|
NC0666 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $36,200 | $51,808 |
n/a
|
WI0409 #11 Y:2001 | 11 | 2001 | Install occupancy sensors | $552 | $200 | |
WI0409 #10 Y:2001 | 10 | 2001 | Utilize higher efficiency lamps and/or ballasts | $808 | - | |
WI0409 #09 Y:2001 | 09 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $1,108 | $1,028 | |
WI0409 #08 Y:2001 | 08 | 2001 | Reduce illumination to minimum necessary levels | $1,668 | - | |
WI0409 #07 Y:2001 | 07 | 2001 | Utilize higher efficiency lamps and/or ballasts | $2,037 | $5,758 | |
WI0409 #06 Y:2001 | 06 | 2001 | Turn off equipment when not in use | $3,015 | - | |
WI0409 #05 Y:2001 | 05 | 2001 | Turn off equipment when not in use | $3,301 | - | |
WI0409 #04 Y:2001 | 04 | 2001 | Improve air circulation with destratification fans / other methods | $5,314 | $4,600 | |
WI0409 #03 Y:2001 | 03 | 2001 | Reschedule plant operations or reduce load to avoid peaks | $7,602 | - | |
WI0409 #02 Y:2001 | 02 | 2001 | Train operators for maximum operating efficiency | $32,500 | - | |
WI0409 #01 Y:2001 | 01 | 2001 | Install solid waste incinerator for heat | $34,371 | $130,000 |