ITAC Assessment: WI0409
ITAC logo
ITAC Assessment: WI0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Knitted Pile Fabric
NAICS
n/a
SIC 2257: Weft Knit Fabric Mills
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 90,000
ft2
Annual Production 6,300
thousand feet
Production Hrs. Annual 5,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,309 2,123,520
kWh
Electricity Demand $69,120 6,722
kW-mo/yr
Electricity Fees $9,891 -
Natural Gas $49,450 6,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.6122: Install solid waste incinerator for heat $34,371 $130,000 - - - $34,371
-
lb
-
02 4.431: Train operators for maximum operating efficiency $32,500 - - - - - $32,500
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,602 - - $7,602
-
kW-mo/yr
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $5,314 $4,600 $(-265.0)
(-7,674)
kWh
- $5,579
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $3,301 - $3,301
95,687
kWh
- - - -
06 2.6218: Turn off equipment when not in use $3,015 - - - $3,015
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,037 $5,758 $1,266
36,888
kWh
$771
-
kW-mo/yr
- - -
08 2.7111: Reduce illumination to minimum necessary levels $1,668 - $1,043
29,453
kWh
$625
-
kW-mo/yr
- - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,108 $1,028 $763
21,551
kWh
$345
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $808 - $536
15,153
kWh
$272
-
kW-mo/yr
- - -
11 2.7135: Install occupancy sensors $552 $200 $552
15,974
kWh
- - - -
TOTAL RECOMMENDED $92,276 $141,586 $7,196
207,032
kWh
$9,615
-
kW-mo/yr
$8,594
-
MMBtu
$34,371
-
lb
$32,500
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs