Assessment Year | 2001 |
---|---|
Principal Product | Knitted Pile Fabric |
NAICS |
n/a
|
SIC | 2257: Weft Knit Fabric Mills |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
90,000
ft2
|
Annual Production | 6,300
thousand feet
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,309 | 2,123,520 |
kWh
|
$0.033 |
Electricity Demand | $69,120 | 6,722 |
kW-mo/yr
|
$10.28 |
Electricity Fees | $9,891 | - |
|
- |
Natural Gas | $49,450 | 6,045 |
MMBtu
|
$8.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,276 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.6122: Install solid waste incinerator for heat | $34,371 | $130,000 | - | - | - |
$34,371
-
lb
|
- | |
02 | 4.431: Train operators for maximum operating efficiency | $32,500 | - | - | - | - | - | $32,500 | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,602 | - | - |
$7,602
-
kW-mo/yr
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $5,314 | $4,600 |
$(-265.0)
(-7,674)
kWh
|
- |
$5,579
-
MMBtu
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $3,301 | - |
$3,301
95,687
kWh
|
- | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $3,015 | - | - | - |
$3,015
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,037 | $5,758 |
$1,266
36,888
kWh
|
$771
-
kW-mo/yr
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $1,668 | - |
$1,043
29,453
kWh
|
$625
-
kW-mo/yr
|
- | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,108 | $1,028 |
$763
21,551
kWh
|
$345
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $808 | - |
$536
15,153
kWh
|
$272
-
kW-mo/yr
|
- | - | - | |
11 | 2.7135: Install occupancy sensors | $552 | $200 |
$552
15,974
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $92,276 | $141,586 |
$7,196
207,032
kWh
|
$9,615
-
kW-mo/yr
|
$8,594
-
MMBtu
|
$34,371
-
lb
|
$32,500 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs