41
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Knit underwear and nightwear mills | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MI0341 #12 Y:2018 | 12 | 2018 | Analyze flue gas for proper air/fuel ratio | $803 | $1,560 | |
MI0341 #11 Y:2018 | 11 | 2018 | Install occupancy sensors | $3,246 | $2,109 | |
MI0341 #10 Y:2018 | 10 | 2018 | Optimize plant power factor | $17,936 | $25,045 | |
MI0341 #09 Y:2018 | 09 | 2018 | Use optimum size and capacity equipment | $24,956 | $7,314 | |
MI0341 #08 Y:2018 | 08 | 2018 | Install vinyl strip / high speed / air curtain doors | $39,872 | $3,380 | |
MI0341 #07 Y:2018 | 07 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $45,466 | $38,639 | |
MI0341 #06 Y:2018 | 06 | 2018 | Utilize higher efficiency lamps and/or ballasts | $49,910 | $35,323 | |
MI0341 #05 Y:2018 | 05 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $49,949 | $6,410 | |
MI0341 #04 Y:2018 | 04 | 2018 | Clean or color roof to reduce solar load | $59,009 | $48,268 | |
MI0341 #03 Y:2018 | 03 | 2018 | Utilize a less expensive cooling method | $69,002 | $300,000 | |
MI0341 #02 Y:2018 | 02 | 2018 | Use waste heat from hot flue gases to preheat | $75,087 | $115,295 | |
MI0341 #01 Y:2018 | 01 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $142,227 | $2,030 | |
NC0521 #09 Y:2014 | 09 | 2014 | Develop a repair/replace policy | $2,162 | $4,256 | |
NC0521 #08 Y:2014 | 08 | 2014 | Install occupancy sensors | $2,313 | $650 | |
NC0521 #07 Y:2014 | 07 | 2014 | Utilize higher efficiency lamps and/or ballasts | $26,870 | $102,717 | |
NC0521 #06 Y:2014 | 06 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,043 | $5,100 | |
NC0521 #05 Y:2014 | 05 | 2014 | Use waste heat from hot flue gases to preheat incoming fluids | $41,376 | $72,000 | |
NC0521 #04 Y:2014 | 04 | 2014 | Use waste heat from hot flue gases to preheat | $21,678 | $40,000 | |
NC0521 #03 Y:2014 | 03 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $57,030 | $40,000 | |
NC0521 #02 Y:2014 | 02 | 2014 | Use or replace with energy efficient substitutes | $364,896 | $1,350,000 |