208
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Broadwoven fabric mills, wool (including dyeing and finishing) | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NC0579 #11 Y:2016 | 11 | 2016 | Repair and eliminate steam leaks | $2,459 | $1,000 | |
NC0579 #10 Y:2016 | 10 | 2016 | Repair or replace steam traps | $7,750 | $8,500 | |
NC0579 #09 Y:2016 | 09 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $1,679 | $230 | |
NC0579 #08 Y:2016 | 08 | 2016 | Develop a repair/replace policy | $2,622 | $5,865 | |
NC0579 #07 Y:2016 | 07 | 2016 | Recover waste heat from equipment | $4,983 | $4,000 | |
NC0579 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $1,575 | $3,000 | |
NC0579 #05 Y:2016 | 05 | 2016 | Reduce the pressure of compressed air to the minimum required | $6,661 | $8,900 | |
NC0579 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,076 | $200 | |
NC0579 #03 Y:2016 | 03 | 2016 | Replace electrically-operated equipment with fossil fuel equipment | $17,247 | $50,000 | |
NC0579 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $46,532 | $113,706 | |
NC0579 #01 Y:2016 | 01 | 2016 | Change rate schedules or other changes in utility service | $52,901 | $500 | |
NC0513 #18 Y:2014 | 18 | 2014 | Recover waste heat from equipment | $9,375 | $37,264 | |
NC0513 #17 Y:2014 | 17 | 2014 | Install / repair insulation on steam lines | $20,435 | $19,607 | |
NC0513 #16 Y:2014 | 16 | 2014 | Insulate feedwater tank | $438 | $257 | |
NC0513 #15 Y:2014 | 15 | 2014 | Keep boiler tubes clean | $13,546 | $500 | |
NC0513 #14 Y:2014 | 14 | 2014 | Increase amount of condensate returned | $9,159 | $5,600 | |
NC0513 #13 Y:2014 | 13 | 2014 | Repair and eliminate steam leaks | $20,840 | $20,000 | |
NC0513 #12 Y:2014 | 12 | 2014 | Repair or replace steam traps | $40,007 | $6,200 | |
NC0513 #11 Y:2014 | 11 | 2014 | Keep boiler tubes clean | $48,265 | $15,000 | |
NC0513 #10 Y:2014 | 10 | 2014 | Use photocell controls | $47 | $80 |