Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,334

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Textile mill products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0698 #11 Y:2026 Use battery storage for demand control $21,343 $76,800
SD0698 #10 Y:2026 Use solar heat to make electricty $67,845 $178,000
SD0698 #09 Y:2026 Use most efficient type of electric motors $16,055 $85,261
SD0698 #08 Y:2026 Utilize higher efficiency lamps and/or ballasts $8,172 $12,660
SD0698 #07 Y:2026 Install direct acting units in place of compressed air pressure system in safety system $1,728 $3,200
SD0698 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $100 $847
SD0698 #05 Y:2026 Recharge batteries on during off-peak demand periods $2,048 -
SD0698 #04 Y:2026 Reschedule plant operations or reduce load to avoid peaks $1,200 -
SD0698 #03 Y:2026 Repair and eliminate steam leaks $2,690 $600
SD0698 #02 Y:2026 Use waste heat from hot flue gases to preheat $1,975 $1,671
SD0698 #01 Y:2026 Increase amount of condensate returned $19,217 $12,000
GT1011 #11 Y:2026 Use solar heat to make electricty $147,568 $1,244,837
GT1011 #10 Y:2026 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $94,207 $517,500
GT1011 #09 Y:2026 Turn off equipment during breaks, reduce operating time $156 $567
GT1011 #08 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $9,701 $25,000
GT1011 #07 Y:2026 Upgrade obsolete equipment $556,343 $675,000
GT1011 #06 Y:2026 Install occupancy sensors $10,382 $11,470
GT1011 #05 Y:2026 Reduce space conditioning during non-working hours $1,645 $1,000
GT1011 #04 Y:2026 Eliminate or reduce compressed air usage $17,554 $900
GT1011 #03 Y:2026 Use highest temperature for chilling or cold storage $3,999 $200