ITAC Assessment: GT1011
ITAC logo
ITAC Assessment: GT1011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hospitality and Healthcare Textiles
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 400,000
ft2
Annual Production 14,947,500
lb
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,559,810 20,632,913
kWh
Natural Gas $60,219 11,928
MMBtu
TOTAL YEARLY COSTS $1,620,029
RECOMMENDED SAVINGS* $1,000,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $12,911 $100 $12,911
169,876
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $145,807 $1,850 $148,707
1,956,672
kWh
- $(-2,900.0) -
03 2.2694: Use highest temperature for chilling or cold storage $3,999 $200 $3,999
52,616
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $17,554 $900 $17,554
230,978
kWh
- - -
05 2.7224: Reduce space conditioning during non-working hours $1,645 $1,000 $1,485
19,548
kWh
$160
-
MMBtu
- -
06 2.7135: Install occupancy sensors $10,382 $11,470 $10,382
136,608
kWh
- - -
07 2.4321: Upgrade obsolete equipment $556,343 $675,000 $221,295
2,911,776
kWh
$6,163
-
MMBtu
$168,000 $160,885
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,701 $25,000 $9,701
127,641
kWh
- - -
09 2.6212: Turn off equipment during breaks, reduce operating time $156 $567 $156
2,053
kWh
- - -
10 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $94,207 $517,500 $123,500
1,625,000
kWh
$(-29,293.0)
-
MMBtu
- -
11 2.9114: Use solar heat to make electricty $147,568 $1,244,837 $147,568
1,952,007
kWh
- - -
TOTAL RECOMMENDED $1,000,273 $2,478,424 $697,258
9,184,775
kWh
$(-22,970.0)
-
MMBtu
$165,100 $160,885
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs