Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Macaroni, spaghetti, vermicelli, and noodles
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0026 #10 Y:2024 Recover heat from exhausted steam, hot air or hot water $706 $1,151
SJ0026 #09 Y:2024 Reduce excessive boiler blowdown $2,261 $1,017
SJ0026 #08 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $4,132 $25,650
SJ0026 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $400 -
SJ0026 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,177 $9,200
SJ0026 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,978 $9,706
SJ0026 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $123,957 $18,405
SJ0026 #03 Y:2024 Preheat boiler makeup water with waste process heat $1,192 $888
SJ0026 #02 Y:2024 Insulate bare equipment $653 $607
SJ0026 #01 Y:2024 Use solar heat to make electricty $79,569 $266,719
IA0495 #07 Y:2013 Use waste heat from hot flue gases to preheat $2,715 $11,000
IA0495 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $106 $35
IA0495 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $853 $500
IA0495 #04 Y:2013 Direct warmest air to combustion intake $623 $350
IA0495 #03 Y:2013 Use or replace with energy efficient substitutes $1,071 $741
IA0495 #02 Y:2013 Install occupancy sensors $189 $612
IA0495 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $3,154 $13,790
IA0257 #11 Y:2000 Replace existing equipment with more suitable substitutes $7,188 $3,010
IA0257 #10 Y:2000 Install automatic packing equipment $234,828 $126,125
IA0257 #09 Y:2000 Recover and reuse cooling water $23,394 $15,250