487
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Potato chips, corn chips, and similar snacks | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
CI0053 #10 Y:2025 | 10 | 2025 | Recharge batteries on during off-peak demand periods | $6,854 | $200 |
n/a
|
CI0053 #09 Y:2025 | 09 | 2025 | Use photocell controls | $14,804 | $4,000 |
n/a
|
CI0053 #08 Y:2025 | 08 | 2025 | Utilize higher efficiency lamps and/or ballasts | $17,542 | $3,762 |
n/a
|
CI0053 #07 Y:2025 | 07 | 2025 | Use battery storage for demand control | $20,703 | $50,000 |
n/a
|
CI0053 #06 Y:2025 | 06 | 2025 | Use most efficient type of electric motors | $26,465 | $20,000 |
n/a
|
CI0053 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $57,280 | $7,800 |
n/a
|
CI0053 #04 Y:2025 | 04 | 2025 | Use optimum thickness insulation | $67,904 | $174,000 |
n/a
|
CI0053 #03 Y:2025 | 03 | 2025 | Preheat combustion air with waste heat | $127,862 | $20,000 |
n/a
|
CI0053 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $138,402 | $619,600 |
n/a
|
CI0053 #01 Y:2025 | 01 | 2025 | Replace fossil fuel equipment with electrical equipment | $316,788 | $3,200,000 |
n/a
|
IP0207 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,969 | $3,653 |
n/a
|
IP0207 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $970 | $1,387 |
n/a
|
IP0207 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $184 | $227 |
n/a
|
IP0207 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $7,162 | $5,708 |
n/a
|
IP0207 #01 Y:2025 | 01 | 2025 | Lower temperature during the winter season and vice-versa | $7,560 | - |
n/a
|
IC0321 #11 Y:2024 | 11 | 2024 | Install occupancy sensors | $706 | $565 |
n/a
|
IC0321 #10 Y:2024 | 10 | 2024 | Reduce the pressure of compressed air to the minimum required | $2,444 | - |
n/a
|
IC0321 #09 Y:2024 | 09 | 2024 | Insulate bare equipment | $2,006 | $701 |
n/a
|
IC0321 #08 Y:2024 | 08 | 2024 | Insulate bare equipment | $19,153 | $1,152 |
n/a
|
IC0321 #07 Y:2024 | 07 | 2024 | Repair and eliminate steam leaks | $7,389 | $352 |
n/a
|