Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

491

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Prepared fresh or frozen fish and seafoods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0132 #09 Y:2018 Utilize higher efficiency lamps and/or ballasts $98 $4,120
WM0132 #08 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $245 $300
WM0132 #07 Y:2018 Reduce the pressure of compressed air to the minimum required $561 -
WM0132 #06 Y:2018 Utilize energy-efficient belts and other improved mechanisms $650 $168
WM0132 #05 Y:2018 Install vinyl strip / high speed / air curtain doors $743 $1,010
WM0132 #04 Y:2018 Use most efficient type of electric motors $992 $1,240
WM0132 #03 Y:2018 Use or replace with energy efficient substitutes $2,382 $12,660
WM0132 #02 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $3,306 $8,640
WM0132 #01 Y:2018 Use solar heat to make electricty $21,662 $106,000
TR0004 #08 Y:2017 Use other methods for neutralization $258,000 $292,000
TR0004 #07 Y:2017 Utilize other methods to remove contaminants $27,235 $100,864
TR0004 #06 Y:2017 Use most efficient type of electric motors $8,148 $29,271
TR0004 #05 Y:2017 Optimize plant power factor $12,722 $56,000
TR0004 #04 Y:2017 Utilize energy-efficient belts and other improved mechanisms $273 -
TR0004 #03 Y:2017 Install replacement doors $2,305 $10,000
TR0004 #02 Y:2017 Recharge batteries on during off-peak demand periods $4,912 -
TR0004 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $666 $1,325
MA0761 #06 Y:2016 Optimize plant power factor $816 $2,000
MA0761 #05 Y:2016 Install / repair insulation on condensate lines $864 $342
MA0761 #04 Y:2016 Minimize water usage $3,035 $4,050