ITAC Assessment: WM0132
ITAC logo
ITAC Assessment: WM0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Batter breaded frozen fish
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 31,740
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 2,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,036 1,377,908
kWh
Electricity Demand $46,284 5,445
kW-mo/yr
Electricity Fees $(-1,282.0) -
Natural Gas $13,352 2,410
MMBtu
Waste Disposal Costs
Water Usage $33,563 3,680
Tgal
TOTAL YEARLY COSTS $197,953
RECOMMENDED SAVINGS* $30,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $21,662 $106,000 $21,662
270,829
kWh
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,306 $8,640 $2,130
27,675
kWh
$1,176
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $2,382 $12,660 $2,067
26,874
kWh
$315
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $992 $1,240 $862
11,202
kWh
$130
-
kW-mo/yr
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $743 $1,010 - - $743
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $650 $168 $419
5,438
kWh
$231
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $561 - $280
3,641
kWh
$281
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $245 $300 $123
1,601
kWh
$122
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $98 $4,120 $64
841
kWh
$10
-
kW-mo/yr
- $24
TOTAL RECOMMENDED $30,638 $134,138 $27,606
348,101
kWh
$2,264
-
kW-mo/yr
$743
-
MMBtu
$24
TOTAL IMPLEMENTED $1,647 $5,430 $467
6,083
kWh
$412
-
kW-mo/yr
$743
-
MMBtu
$24
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs