| Assessment Year | 2016 |
|---|---|
| Principal Product | Fresh and frozen fish items |
| NAICS | 311710: Seafood Product Preparation and Packaging |
| SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
12,000
ft2
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $213,947 | 1,458,600 |
kWh
|
$0.15 | |
| Electricity Demand | $22,502 | 5,740 |
kW-mo/yr
|
$3.92 | |
| Electricity Fees | $2,400 | - |
|
- | |
| Natural Gas | $68,843 | 5,101 |
MMBtu
|
$13.50 | |
| Waste Disposal Costs | |||||
| Water Usage | $15,763 | 2,914 |
Tgal
|
$5.41 | |
| TOTAL YEARLY COSTS | $323,455 | ||||
| RECOMMENDED SAVINGS* | $41,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2622: Replace existing chiller with high efficiency model | $22,997 | $134,000 |
$22,997
156,442
kWh
|
- | - | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,889 | $2,685 |
$7,889
53,665
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,969 | $6,409 |
$5,969
40,606
kWh
|
- | - | - | |
| 04 | 3.4151: Minimize water usage | $3,035 | $4,050 |
$(-200.0)
(-1,359)
kWh
|
- | - |
$3,235
-
Tgal
|
|
| 05 | 2.2122: Install / repair insulation on condensate lines | $864 | $342 | - | - |
$864
-
MMBtu
|
- | |
| 06 | 2.3212: Optimize plant power factor | $816 | $2,000 | - |
$816
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $41,570 | $149,486 |
$36,655
249,354
kWh
|
$816
-
kW-mo/yr
|
$864
-
MMBtu
|
$3,235
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs