ITAC Assessment: UL0214
ITAC logo
ITAC Assessment: UL0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Soybean Oil
NAICS
n/a
SIC 2075: Soybean Oil Mills
Sales Range n/a
# of Employees 32
Plant Area 120,000
ft2
Annual Production 400,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,432,993 44,578,840
kWh
Electricity Demand $142,975 108,480
kW-mo/yr
Natural Gas $833,806 271,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,841 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $12,122 $6,950 - - $12,122
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $2,243 $119 $2,120
65,944
kWh
$123
-
kW-mo/yr
- -
03 2.7111: Reduce illumination to minimum necessary levels $5,476 $2,192 $4,891
151,817
kWh
$194
-
kW-mo/yr
- $391
TOTAL RECOMMENDED $19,841 $9,261 $7,011
217,761
kWh
$317
-
kW-mo/yr
$12,122
-
MMBtu
$391
TOTAL IMPLEMENTED $14,365 $7,069 $2,120
65,944
kWh
$123
-
kW-mo/yr
$12,122
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs