42
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| DL0187 #10 Y:2020 | 10 | 2020 | Utilize higher efficiency lamps and/or ballasts | $2,153 | $1,574 | |
| DL0187 #09 Y:2020 | 09 | 2020 | Use cooling air which cools hot work pieces for space heating | $797 | $4,000 | |
| DL0187 #08 Y:2020 | 08 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $52,324 | $119,348 | |
| DL0187 #07 Y:2020 | 07 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $3,400 | $9,500 | |
| DL0187 #06 Y:2020 | 06 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $8,370 | $6,500 | |
| DL0187 #05 Y:2020 | 05 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,940 | $5,000 | |
| DL0187 #04 Y:2020 | 04 | 2020 | Upgrade controls on compressors | $596 | $1,200 | |
| DL0187 #03 Y:2020 | 03 | 2020 | Use most efficient type of electric motors | $3,480 | $4,900 | |
| DL0187 #02 Y:2020 | 02 | 2020 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $13,620 | - | |
| DL0187 #01 Y:2020 | 01 | 2020 | Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,390 | - | |
| WV0602 #10 Y:2020 | 10 | 2020 | Establish a predictive maintenance program | $136 | $570 | |
| WV0602 #09 Y:2020 | 09 | 2020 | Develop a repair/replace policy | $154 | $568 | |
| WV0602 #08 Y:2020 | 08 | 2020 | Reduce the pressure of compressed air to the minimum required | $263 | $1,060 | |
| WV0602 #07 Y:2020 | 07 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $268 | $1,225 | |
| WV0602 #06 Y:2020 | 06 | 2020 | Upgrade controls on compressors | $322 | $299 | |
| WV0602 #05 Y:2020 | 05 | 2020 | Upgrade controls on compressors | $743 | $1,348 | |
| WV0602 #04 Y:2020 | 04 | 2020 | Insulate bare equipment | $1,512 | $2,197 | |
| WV0602 #03 Y:2020 | 03 | 2020 | Install occupancy sensors | $1,669 | $2,886 | |
| WV0602 #02 Y:2020 | 02 | 2020 | Direct warmest air to combustion intake | $4,212 | $8,168 | |
| WV0602 #01 Y:2020 | 01 | 2020 | Analyze flue gas for proper air/fuel ratio | $5,049 | $3,000 |