Assessment Year | 2021 |
---|---|
Principal Product | Packaged Vegetable and Salad Products |
NAICS | 311991: Perishable Prepared Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
99,609
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 5,125
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $206,665 | 3,324,000 |
kWh
|
$0.062 | |
Electricity Demand | $18,713 | 7,346 |
kW-mo/yr
|
$2.55 | |
Electricity Fees | $2,038 | - |
|
- | |
Natural Gas | $3,972 | 474 |
MMBtu
|
$8.38 | |
Waste Disposal Costs | |||||
Water Usage | $67,046 | 20,116 |
Tgal
|
$3.33 | |
TOTAL YEARLY COSTS | $298,434 | ||||
RECOMMENDED SAVINGS* | $90,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $21,103 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,390 | - |
$1,390
20,420
kWh
|
- | |
02 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $13,620 | - |
$13,620
200,269
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $3,480 | $4,900 |
$3,480
51,190
kWh
|
- | |
04 | 2.4224: Upgrade controls on compressors | $596 | $1,200 |
$596
8,766
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,940 | $5,000 |
$3,940
57,990
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,370 | $6,500 |
$8,370
123,050
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,400 | $9,500 |
$3,400
50,700
kWh
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $52,324 | $119,348 |
$52,324
769,470
kWh
|
- | |
09 | 2.2491: Use cooling air which cools hot work pieces for space heating | $797 | $4,000 | - |
$797
-
MMBtu
|
|
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,153 | $1,574 |
$2,153
31,660
kWh
|
- | |
TOTAL RECOMMENDED | $90,070 | $152,022 |
$89,273
1,313,515
kWh
|
$797
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,103 | $6,574 |
$21,103
310,339
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs