58
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Bottled and canned soft drinks and carbonated waters | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| KU0493 #07 Y:1998 | 07 | 1998 | Analyze flue gas for proper air/fuel ratio | $600 | $1,000 | |
| KU0493 #06 Y:1998 | 06 | 1998 | Install timers on light switches in little used areas | $770 | $600 | |
| KU0493 #05 Y:1998 | 05 | 1998 | Isolate hot or cold equipment | $1,310 | $1,000 | |
| KU0493 #04 Y:1998 | 04 | 1998 | Utilize higher efficiency lamps and/or ballasts | $2,290 | $4,940 | |
| KU0493 #03 Y:1998 | 03 | 1998 | Use most efficient type of electric motors | $4,340 | $9,530 | |
| KU0493 #02 Y:1998 | 02 | 1998 | Change rate schedules or other changes in utility service | $6,810 | - | |
| KU0493 #01 Y:1998 | 01 | 1998 | Use optimum temperature | $28,340 | $3,500 | |
| MO0198 #11 Y:1997 | 11 | 1997 | Use evaporation to concentrate material | $6,176 | $18,000 | |
| MO0198 #10 Y:1997 | 10 | 1997 | Recover and reuse waste material | $276 | - | |
| MO0198 #09 Y:1997 | 09 | 1997 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $4,582 | $8,400 | |
| MO0198 #08 Y:1997 | 08 | 1997 | Reduce the pressure of compressed air to the minimum required | $152 | $40 | |
| MO0198 #07 Y:1997 | 07 | 1997 | Install compressor air intakes in coolest locations | $243 | $48 | |
| MO0198 #06 Y:1997 | 06 | 1997 | Utilize higher efficiency lamps and/or ballasts | $148 | - | |
| MO0198 #05 Y:1997 | 05 | 1997 | Utilize higher efficiency lamps and/or ballasts | $1,061 | $1,790 | |
| MO0198 #04 Y:1997 | 04 | 1997 | Utilize higher efficiency lamps and/or ballasts | $1,990 | $5,544 | |
| MO0198 #03 Y:1997 | 03 | 1997 | Re-arrange equipment layout to reduce handling costs | $3,488 | $10,000 | |
| MO0198 #02 Y:1997 | 02 | 1997 | Begin a practice of predictive / preventative maintenance | $7,440 | $4,500 | |
| MO0198 #01 Y:1997 | 01 | 1997 | Initiate a total quality management program | $19,395 | $15,000 |