Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bottled and canned soft drinks and carbonated waters
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0493 #07 Y:1998 Analyze flue gas for proper air/fuel ratio $600 $1,000
KU0493 #06 Y:1998 Install timers on light switches in little used areas $770 $600
KU0493 #05 Y:1998 Isolate hot or cold equipment $1,310 $1,000
KU0493 #04 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,290 $4,940
KU0493 #03 Y:1998 Use most efficient type of electric motors $4,340 $9,530
KU0493 #02 Y:1998 Change rate schedules or other changes in utility service $6,810 -
KU0493 #01 Y:1998 Use optimum temperature $28,340 $3,500
MO0198 #11 Y:1997 Use evaporation to concentrate material $6,176 $18,000
MO0198 #10 Y:1997 Recover and reuse waste material $276 -
MO0198 #09 Y:1997 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $4,582 $8,400
MO0198 #08 Y:1997 Reduce the pressure of compressed air to the minimum required $152 $40
MO0198 #07 Y:1997 Install compressor air intakes in coolest locations $243 $48
MO0198 #06 Y:1997 Utilize higher efficiency lamps and/or ballasts $148 -
MO0198 #05 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,061 $1,790
MO0198 #04 Y:1997 Utilize higher efficiency lamps and/or ballasts $1,990 $5,544
MO0198 #03 Y:1997 Re-arrange equipment layout to reduce handling costs $3,488 $10,000
MO0198 #02 Y:1997 Begin a practice of predictive / preventative maintenance $7,440 $4,500
MO0198 #01 Y:1997 Initiate a total quality management program $19,395 $15,000