Assessment Year | 1997 |
---|---|
Principal Product | Carbonated Beverages |
NAICS |
n/a
|
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 270 |
Plant Area |
38,750
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $39,628 | 1,592,028 |
kWh
|
$0.025 |
Electricity Demand | $26,450 | 400 |
kW-mo/yr
|
$66.13 |
Electricity Fees | $5,723 | - |
|
- |
Natural Gas | $46,005 | 10,742 |
MMBtu
|
$4.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,553 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.711: Initiate a total quality management program | $19,395 | $15,000 | - | - | - | - | $19,395 | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $7,440 | $4,500 | - | - | - | - | $7,440 | |
03 | 4.514: Re-arrange equipment layout to reduce handling costs | $3,488 | $10,000 | - | - | - | - | $3,488 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,990 | $5,544 |
$1,144
40,152
kWh
|
$846
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,061 | $1,790 |
$611
21,395
kWh
|
$450
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $148 | - |
$115
4,103
kWh
|
$33
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $243 | $48 |
$150
5,275
kWh
|
$93
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $152 | $40 |
$92
3,224
kWh
|
$60
-
kW-mo/yr
|
- | - | - | |
09 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $4,582 | $8,400 |
$4,582
270,809
kWh
|
- | - | - | - | |
10 | 3.5311: Recover and reuse waste material | $276 | - | - | - | - |
$276
-
lb
|
- | |
11 | 3.3131: Use evaporation to concentrate material | $6,176 | $18,000 | - | - |
$6,176
-
gal
|
- | - | |
TOTAL RECOMMENDED | $44,951 | $63,322 |
$6,694
344,958
kWh
|
$1,482
-
kW-mo/yr
|
$6,176
-
gal
|
$276
-
lb
|
$30,323 | ||
TOTAL IMPLEMENTED | $30,553 | $26,882 |
$2,020
70,925
kWh
|
$1,422
-
kW-mo/yr
|
- |
$276
-
lb
|
$26,835 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs