ITAC Assessment: MO0198
ITAC logo
ITAC Assessment: MO0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Carbonated Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 38,750
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,628 1,592,028
kWh
Electricity Demand $26,450 400
kW-mo/yr
Electricity Fees $5,723 -
Natural Gas $46,005 10,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,553

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $19,395 $15,000 - - - - $19,395
02 4.611: Begin a practice of predictive / preventative maintenance $7,440 $4,500 - - - - $7,440
03 4.514: Re-arrange equipment layout to reduce handling costs $3,488 $10,000 - - - - $3,488
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,990 $5,544 $1,144
40,152
kWh
$846
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,061 $1,790 $611
21,395
kWh
$450
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $148 - $115
4,103
kWh
$33
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $243 $48 $150
5,275
kWh
$93
-
kW-mo/yr
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $152 $40 $92
3,224
kWh
$60
-
kW-mo/yr
- - -
09 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $4,582 $8,400 $4,582
270,809
kWh
- - - -
10 3.5311: Recover and reuse waste material $276 - - - - $276
-
lb
-
11 3.3131: Use evaporation to concentrate material $6,176 $18,000 - - $6,176
-
gal
- -
TOTAL RECOMMENDED $44,951 $63,322 $6,694
344,958
kWh
$1,482
-
kW-mo/yr
$6,176
-
gal
$276
-
lb
$30,323
TOTAL IMPLEMENTED $30,553 $26,882 $2,020
70,925
kWh
$1,422
-
kW-mo/yr
- $276
-
lb
$26,835
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs