Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product carbonated soft drink
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 101
Plant Area 95,230
ft2
Annual Production 25,100,000
pieces
Production Hrs. Annual 5,020
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,577 6,248,828
kWh
Electricity Demand $125,756 14,262
kW-mo/yr
Natural Gas $135,672 26,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $184,691 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,920

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2211: Use optimum temperature $28,340 $3,500 - - $28,340
-
MMBtu
- - - - - - -
02 2.8114: Change rate schedules or other changes in utility service $6,810 - - $21,370
-
kW-mo/yr
- - - - $(-14,560.0) - - -
03 2.4133: Use most efficient type of electric motors $4,340 $9,530 $2,830
71,512
kWh
$1,510
-
kW-mo/yr
- - - - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,290 $4,940 $1,480
37,515
kWh
$810
-
kW-mo/yr
- - - - - - - -
05 2.2522: Isolate hot or cold equipment $1,310 $1,000 $1,110
28,136
kWh
$590
-
kW-mo/yr
$(-390.0)
-
MMBtu
- - - - - - -
06 2.7132: Install timers on light switches in little used areas $770 $600 $770
19,343
kWh
- - - - - - - - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $600 $1,000 - - $600
-
MMBtu
- - - - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $460 $540 $120
2,931
kWh
$40
-
kW-mo/yr
- - - - $300 - - -
09 3.4111: Use closed cycle process to minimize waste water production $60,681 $3,050 $(-45.0)
(-1,172)
kWh
$(-24.0)
-
kW-mo/yr
- $4,460
-
Tgal
- - - - - $56,290
10 3.5313: Increase amount of waste recovered for resale $77,980 $2,020 - - - - - $53,740
-
lb
- $24,240 - -
11 3.8132: Use less toxic and volatile solvent substitutes $580 $1,050 - - - - $870
-
gal
- - - $(-290.0) -
12 3.8314: Purchase high materials in returnable bulk containers $530 $90 - - - - - - - - - $530
TOTAL RECOMMENDED $184,691 $27,320 $6,265
158,265
kWh
$24,296
-
kW-mo/yr
$28,550
-
MMBtu
$4,460
-
Tgal
$870
-
gal
$53,740
-
lb
$(-14,260.0) $24,240 $(-290.0) $56,820
TOTAL IMPLEMENTED $37,920 $21,560 $5,540
140,094
kWh
$2,950
-
kW-mo/yr
$28,550
-
MMBtu
- $870
-
gal
- $300 - $(-290.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings