ITAC Assessment: UD0507
ITAC logo
ITAC Assessment: UD0507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fabricated structural steel, industrial welding
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 34,000
ft2
Annual Production 3,800
ton
Production Hrs. Annual 2,900
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,834 374,560
kWh
Electricity Demand $25,576 2,112
kW-mo/yr
LPG $16,352 1,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
01 2.1331: Burn a less expensive grade of fuel $5,738 $7,500 - - - $(-8,702.0)
-
MMBtu
$14,440
-
MMBtu
02 2.3137: Use power during off-peak periods $9,357 - - $10,317
-
kW-mo/yr
$(-960.0) - -
03 2.2212: Use minimum safe oven ventilation $1,228 $5,000 - - - - $1,228
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $833 $3,271 $386
12,309
kWh
$563
-
kW-mo/yr
- $(-116.0)
-
MMBtu
-
TOTAL RECOMMENDED $17,156 $15,771 $386
12,309
kWh
$10,880
-
kW-mo/yr
$(-960.0) $(-8,818.0)
-
MMBtu
$15,668
-
MMBtu
TOTAL IMPLEMENTED $1,228 $5,000 - - - - $1,228
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs