| Assessment Year | 1992 |
|---|---|
| Principal Product | FLUID MILK |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
n/a
|
| Annual Production | 26,000
Tgal
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $517,525 | 10,605,510 |
kWh
|
$0.049 |
| Natural Gas | $97,925 | 31,787 |
MMBtu
|
$3.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,876 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,693 | $8,240 |
$1,899
38,980
kWh
|
- | $(-206.0) | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,233 | $27,230 |
$1,233
25,205
kWh
|
- | - | |
| 03 | 2.2531: Re-size charging openings or add movable cover or door | $140 | $100 |
$140
2,931
kWh
|
- | - | |
| 04 | 2.2447: Heat water with exhaust heat | $690 | $1,490 | - |
$690
-
MMBtu
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,470 | $450 | - |
$3,920
-
MMBtu
|
$(-450.0) | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,120 | $550 |
$25,120
2,391,559
kWh
|
- | - | |
| 07 | 2.2136: Install / repair insulation on steam lines | $330 | $690 | - |
$330
-
MMBtu
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,200 | $6,500 |
$2,200
45,135
kWh
|
- | - | |
| TOTAL RECOMMENDED | $34,876 | $45,250 |
$30,592
2,503,810
kWh
|
$4,940
-
MMBtu
|
$(-656.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs