Assessment Year | 1992 |
---|---|
Principal Product | FLUID MILK |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 26,000
Tgal
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $517,525 | 10,605,510 |
kWh
|
$0.049 |
Natural Gas | $97,925 | 31,787 |
MMBtu
|
$3.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,876 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,693 | $8,240 |
$1,899
38,980
kWh
|
- | $(-206.0) | |
02 | 2.4133: Use most efficient type of electric motors | $1,233 | $27,230 |
$1,233
25,205
kWh
|
- | - | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $140 | $100 |
$140
2,931
kWh
|
- | - | |
04 | 2.2447: Heat water with exhaust heat | $690 | $1,490 | - |
$690
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,470 | $450 | - |
$3,920
-
MMBtu
|
$(-450.0) | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,120 | $550 |
$25,120
2,391,559
kWh
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $330 | $690 | - |
$330
-
MMBtu
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,200 | $6,500 |
$2,200
45,135
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,876 | $45,250 |
$30,592
2,503,810
kWh
|
$4,940
-
MMBtu
|
$(-656.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs