ITAC Assessment: GT0477
ITAC logo
ITAC Assessment: GT0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLUID MILK
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 26,000
Tgal
Production Hrs. Annual 4,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $517,525 10,605,510
kWh
Natural Gas $97,925 31,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,693 $8,240 $1,899
38,980
kWh
- $(-206.0)
02 2.4133: Use most efficient type of electric motors $1,233 $27,230 $1,233
25,205
kWh
- -
03 2.2531: Re-size charging openings or add movable cover or door $140 $100 $140
2,931
kWh
- -
04 2.2447: Heat water with exhaust heat $690 $1,490 - $690
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,470 $450 - $3,920
-
MMBtu
$(-450.0)
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,120 $550 $25,120
2,391,559
kWh
- -
07 2.2136: Install / repair insulation on steam lines $330 $690 - $330
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,200 $6,500 $2,200
45,135
kWh
- -
TOTAL RECOMMENDED $34,876 $45,250 $30,592
2,503,810
kWh
$4,940
-
MMBtu
$(-656.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs