Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beverages
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0150 #10 Y:2008 Use or replace with energy efficient substitutes $246,428 $26,100
IC0150 #09 Y:2008 Repair and eliminate steam leaks $8,494 $3,000
IC0150 #08 Y:2008 Use solar heat to heat water $468 $4,411
IC0150 #07 Y:2008 Repair or replace steam traps $71,867 $2,470
IC0150 #06 Y:2008 Install / repair insulation on steam lines $21,400 $8,021
IC0150 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $27,921 $6,440
IC0150 #04 Y:2008 Analyze flue gas for proper air/fuel ratio $26,630 -
IC0150 #03 Y:2008 Turn off steam tracing during mild weather $229 $229
IC0150 #02 Y:2008 Repair and eliminate steam leaks $1,054 $2,900
IC0150 #01 Y:2008 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $391,205 $3,038,750
WI0521 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $630 -
WI0521 #06 Y:2006 Recharge batteries on during off-peak demand periods $1,035 $500
WI0521 #05 Y:2006 Install compressor air intakes in coolest locations $1,630 $3,200
WI0521 #04 Y:2006 Use waste heat from hot flue gases to preheat $5,386 $11,000
WI0521 #03 Y:2006 Modify refrigeration system to operate at a lower pressure $6,900 $18,000
WI0521 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $9,408 $13,600
WI0521 #01 Y:2006 Utilize other methods to remove contaminants $222,888 $230,600
WI0332 #06 Y:1998 Utilize higher efficiency lamps and/or ballasts $368 $226
WI0332 #05 Y:1998 Reschedule plant operations or reduce load to avoid peaks $535 -
WI0332 #04 Y:1998 Install timers and/or thermostats $4,198 $200