matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0150 #10 Y:2008 | 10 | 2008 | Use or replace with energy efficient substitutes | $246,428 | $26,100 | |
| IC0150 #09 Y:2008 | 09 | 2008 | Repair and eliminate steam leaks | $8,494 | $3,000 | |
| IC0150 #08 Y:2008 | 08 | 2008 | Use solar heat to heat water | $468 | $4,411 | |
| IC0150 #07 Y:2008 | 07 | 2008 | Repair or replace steam traps | $71,867 | $2,470 | |
| IC0150 #06 Y:2008 | 06 | 2008 | Install / repair insulation on steam lines | $21,400 | $8,021 | |
| IC0150 #05 Y:2008 | 05 | 2008 | Eliminate leaks in inert gas and compressed air lines/ valves | $27,921 | $6,440 | |
| IC0150 #04 Y:2008 | 04 | 2008 | Analyze flue gas for proper air/fuel ratio | $26,630 | - | |
| IC0150 #03 Y:2008 | 03 | 2008 | Turn off steam tracing during mild weather | $229 | $229 | |
| IC0150 #02 Y:2008 | 02 | 2008 | Repair and eliminate steam leaks | $1,054 | $2,900 | |
| IC0150 #01 Y:2008 | 01 | 2008 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $391,205 | $3,038,750 | |
| WI0521 #07 Y:2006 | 07 | 2006 | Reduce the pressure of compressed air to the minimum required | $630 | - | |
| WI0521 #06 Y:2006 | 06 | 2006 | Recharge batteries on during off-peak demand periods | $1,035 | $500 | |
| WI0521 #05 Y:2006 | 05 | 2006 | Install compressor air intakes in coolest locations | $1,630 | $3,200 | |
| WI0521 #04 Y:2006 | 04 | 2006 | Use waste heat from hot flue gases to preheat | $5,386 | $11,000 | |
| WI0521 #03 Y:2006 | 03 | 2006 | Modify refrigeration system to operate at a lower pressure | $6,900 | $18,000 | |
| WI0521 #02 Y:2006 | 02 | 2006 | Utilize higher efficiency lamps and/or ballasts | $9,408 | $13,600 | |
| WI0521 #01 Y:2006 | 01 | 2006 | Utilize other methods to remove contaminants | $222,888 | $230,600 | |
| WI0332 #06 Y:1998 | 06 | 1998 | Utilize higher efficiency lamps and/or ballasts | $368 | $226 | |
| WI0332 #05 Y:1998 | 05 | 1998 | Reschedule plant operations or reduce load to avoid peaks | $535 | - | |
| WI0332 #04 Y:1998 | 04 | 1998 | Install timers and/or thermostats | $4,198 | $200 |