Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sugar and confectionery products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0804 #14 Y:2010 Optimize plant power factor $2,073 $8,279
OK0804 #13 Y:2010 Use waste heat from hot flue gases to preheat $3,107 $19,271
OK0804 #12 Y:2010 Install compressor air intakes in coolest locations $807 $1,843
OK0804 #11 Y:2010 Eliminate or reduce compressed air usage $1,295 $2,286
OK0804 #10 Y:2010 Reduce the pressure of compressed air to the minimum required $2,632 $4,325
OK0804 #09 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $6,362 $750
OK0804 #08 Y:2010 Utilize higher efficiency lamps and/or ballasts $1,244 $4,120
OK0804 #07 Y:2010 Utilize higher efficiency lamps and/or ballasts $5,223 $18,797
OK0804 #06 Y:2010 Utilize higher efficiency lamps and/or ballasts $9,996 $28,404
OK0804 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $14,796 $56,474
OK0804 #04 Y:2010 Install set-back timers $740 $1,625
OK0804 #03 Y:2010 Shut off cooling if cold outside air will cool process $12,835 $19,625
OK0804 #02 Y:2010 Replace existing chiller with high efficiency model $64,961 $238,050
OK0804 #01 Y:2010 Install anaerobic digester $544,130 $5,652,880
OK0579 #14 Y:1999 Install equipment (eg compactor) to reduce disposal costs $896 -
OK0579 #13 Y:1999 Utilize higher efficiency lamps and/or ballasts $1,239 $850
OK0579 #12 Y:1999 Pay bills on time to avoid late fees $1,409 -
OK0579 #11 Y:1999 Use less wasteful packaging $1,850 $2,956
OK0579 #10 Y:1999 Optimize plant power factor $2,368 $1,500