Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,885

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bread and other bakery products, except cookies and crackers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0345 #09 Y:2025 Upgrade controls on compressors $13,516 $10,000
TT0345 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $14,442 $3,250
TT0345 #07 Y:2025 Recover waste heat from equipment $9,214 $15,000
TT0345 #06 Y:2025 Change rate schedules or other changes in utility service $35,814 -
TT0345 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,421 $2,000
TT0345 #04 Y:2025 Install occupancy sensors $1,024 $690
TT0345 #03 Y:2025 Analyze flue gas for proper air/fuel ratio $6,868 $1,400
TT0345 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $4,717 $60
TT0345 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $12,654 $8,950
SU0581 #10 Y:2025 Install occupancy sensors $123 $769
SU0581 #09 Y:2025 Recover waste heat from equipment $4,318 $15,784
SU0581 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $149 $172
SU0581 #07 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,877 $1,220
SU0581 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,579 $1,648
SU0581 #05 Y:2025 Use or replace with energy efficient substitutes $697 $38
SU0581 #04 Y:2025 Reduce space conditioning during non-working hours $1,336 -
SU0581 #03 Y:2025 Eliminate or reduce compressed air usage $1,466 -
SU0581 #02 Y:2025 Disconnect ballasts $331 -
SU0581 #01 Y:2025 Recharge batteries on during off-peak demand periods $990 -
UF0636 #12 Y:2025 Meter recycled water (to reduce sewer charges) $71,586 $4,000