Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Dog and cat food
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0319 #05 Y:2011 Meter waste water $10,797 $3,240
LE0319 #04 Y:2011 Operate boilers on high fire setting $16,771 -
LE0319 #03 Y:2011 Reduce the pressure of compressed air to the minimum required $22,751 $160
LE0319 #02 Y:2011 Utilize energy-efficient belts and other improved mechanisms $30,212 $5,424
LE0319 #01 Y:2011 Minimize water usage $66,284 $168,000
LE0253 #12 Y:2007 Reduce hot water temperature to the minimum required $60,000 $100,000
LE0253 #11 Y:2007 Turn off equipment when not in use $1,980 $510
LE0253 #10 Y:2007 Reschedule plant operations or reduce load to avoid peaks $5,672 $2,500
LE0253 #09 Y:2007 Install timers and/or thermostats $8,342 $480
LE0253 #08 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $9,349 $6,200
LE0253 #07 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $12,186 $1,000
LE0253 #06 Y:2007 Replace heat treating oven with more efficient unit $12,436 $15,000
LE0253 #05 Y:2007 Use heat from boiler blowdown to preheat boiler feed water $20,819 $37,000
LE0253 #04 Y:2007 Use optimum size and capacity equipment $20,904 $300
LE0253 #03 Y:2007 Turn off equipment when not in use $22,542 $300
LE0253 #02 Y:2007 Eliminate/reduce an operation $40,620 $4,000
LE0253 #01 Y:2007 Install partitions to reduce size of conditioned space $41,910 $32,000