Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Grain mill products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0256 #14 Y:2004 Purchase appropriately sized material $12,480 $1,000
BD0256 #13 Y:2004 Minimize water usage $3,869 $1,250
BD0256 #12 Y:2004 Reuse / recycle/ sell paper products $5,460 -
BD0256 #11 Y:2004 Utilize higher efficiency lamps and/or ballasts $475 $551
BD0256 #10 Y:2004 Use photocell controls $1,352 $250
BD0256 #09 Y:2004 Install occupancy sensors $1,650 $600
BD0256 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,959 $420
BD0256 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $4,832 $9,540
BD0256 #06 Y:2004 Utilize energy-efficient belts and other improved mechanisms $5,554 $1,845
BD0256 #05 Y:2004 Use or replace with energy efficient substitutes $7,326 $16,700
BD0256 #04 Y:2004 Reduce illumination to minimum necessary levels $8,310 $645
BD0256 #03 Y:2004 Reduce the pressure of compressed air to the minimum required $10,608 -
BD0256 #02 Y:2004 Recover waste heat from equipment $62,641 $14,500
BD0256 #01 Y:2004 Recover waste heat from equipment $146,428 $60,000
WI0145 #08 Y:1992 Install compressor air intakes in coolest locations $653 $640
WI0145 #07 Y:1992 Analyze flue gas for proper air/fuel ratio $1,642 $500
WI0145 #06 Y:1992 Lower temperature during the winter season and vice-versa $2,365 -
WI0145 #05 Y:1992 Utilize higher efficiency lamps and/or ballasts $1,952 $5,672
WI0145 #04 Y:1992 Reschedule plant operations or reduce load to avoid peaks $3,026 -
WI0145 #03 Y:1992 Recharge batteries on during off-peak demand periods $3,542 -