ITAC Assessment: WI0145
ITAC logo
ITAC Assessment: WI0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BAKERY
NAICS
n/a
SIC 2045: Prepared Flour Mixes and Doughs
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $286,080 3,799,824
kWh
Natural Gas $40,758 11,774
MMBtu
Fuel Oil #6 $25,852 7,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,167

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,069 $8,681 $5,069
67,409
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,330 - $2,330
31,067
kWh
- - -
03 2.3132: Recharge batteries on during off-peak demand periods $3,542 - $3,542
-
kWh
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,026 - $3,826
-
kWh
- - $(-800.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,952 $5,672 $1,722
22,860
kWh
- - $230
06 2.7221: Lower temperature during the winter season and vice-versa $2,365 - - $2,365
-
MMBtu
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,642 $500 - - $1,642
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $653 $640 $653
8,792
kWh
- - -
TOTAL RECOMMENDED $20,579 $15,493 $17,142
130,128
kWh
$2,365
-
MMBtu
$1,642
-
MMBtu
$(-570.0)
TOTAL IMPLEMENTED $8,167 $1,140 $6,525
39,859
kWh
- $1,642
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs