| Assessment Year | 1992 |
|---|---|
| Principal Product | BAKERY |
| NAICS |
n/a
|
| SIC | 2045: Prepared Flour Mixes and Doughs |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 1,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $286,080 | 3,799,824 |
kWh
|
$0.075 |
| Natural Gas | $40,758 | 11,774 |
MMBtu
|
$3.46 |
| Fuel Oil #6 | $25,852 | 7,915 |
MMBtu
|
$3.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,167 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,069 | $8,681 |
$5,069
67,409
kWh
|
- | - | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,330 | - |
$2,330
31,067
kWh
|
- | - | - | |
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $3,542 | - |
$3,542
-
kWh
|
- | - | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,026 | - |
$3,826
-
kWh
|
- | - | $(-800.0) | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,952 | $5,672 |
$1,722
22,860
kWh
|
- | - | $230 | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,365 | - | - |
$2,365
-
MMBtu
|
- | - | |
| 07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,642 | $500 | - | - |
$1,642
-
MMBtu
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $653 | $640 |
$653
8,792
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $20,579 | $15,493 |
$17,142
130,128
kWh
|
$2,365
-
MMBtu
|
$1,642
-
MMBtu
|
$(-570.0) | ||
| TOTAL IMPLEMENTED | $8,167 | $1,140 |
$6,525
39,859
kWh
|
- |
$1,642
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs