ITAC Assessment: AS0557
ITAC logo
ITAC Assessment: AS0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product general aviation/fuel
NAICS 488119: Other Airport Operations
SIC 4581: Airports, Flying Fields, and Airport Terminal Services
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 347,859
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,631 172,430
kWh
Electricity Demand $3,890 475
kW-mo/yr
Electricity Fees $16,221 -
Natural Gas $6,669 250
MMBtu
Other Gas $452,747 10,708
MMBtu
Waste Disposal Costs
Water Usage $4,288 526
Tgal
TOTAL YEARLY COSTS $501,446
RECOMMENDED SAVINGS* $12,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.122: Develop standard procedures to improve internal yields $5,610 $960 - - - - $5,610
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,169 $2,419 $2,100
20,591
kWh
$440
-
kW-mo/yr
- $629 -
03 2.9114: Use solar heat to make electricty $1,986 $19,728 $1,866
18,292
kWh
$120
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $1,118 $160 $973
9,538
kWh
$145
-
kW-mo/yr
- - -
05 2.7226: Use computer programs to optimize hvac performance $333 $284 $285
2,799
kWh
$48
-
kW-mo/yr
- - -
06 3.4151: Minimize water usage $233 $30 - - $233 - -
07 2.7132: Install timers on light switches in little used areas $46 $294 $46
449
kWh
- - - -
TOTAL RECOMMENDED $12,495 $23,875 $5,270
51,669
kWh
$753
-
kW-mo/yr
$233 $629 $5,610
TOTAL IMPLEMENTED $5,534 $22,725 $4,297
42,131
kWh
$608
-
kW-mo/yr
- $629 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs