15
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Canned specialties | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0704 #06 Y:2018 | 06 | 2018 | Modify facility to avoid excess maintenance costs | $5,586 | $14,266 | |
| OR0704 #05 Y:2018 | 05 | 2018 | Recover heat from exhausted steam, hot air or hot water | $12,192 | $2,161 | |
| OR0704 #04 Y:2018 | 04 | 2018 | Minimize water usage | $28,545 | $540 | |
| OR0704 #03 Y:2018 | 03 | 2018 | Use waste heat from hot flue gases to preheat | $40,837 | $72,155 | |
| OR0704 #02 Y:2018 | 02 | 2018 | Utilize a less expensive cooling method | $127,144 | $201,450 | |
| OR0704 #01 Y:2018 | 01 | 2018 | Use filter and drying oven to reduce sludge volume | $510,333 | $740,000 | |
| OR0088 #09 Y:1990 | 09 | 1990 | Use waste heat from hot flue gases to preheat | $1,302 | $2,837 | |
| OR0088 #08 Y:1990 | 08 | 1990 | Use most efficient type of electric motors | $198 | $392 | |
| OR0088 #07 Y:1990 | 07 | 1990 | Modify refrigeration system to operate at a lower pressure | $344 | $600 | |
| OR0088 #06 Y:1990 | 06 | 1990 | Insulate feedwater tank | $745 | $1,198 | |
| OR0088 #05 Y:1990 | 05 | 1990 | Utilize higher efficiency lamps and/or ballasts | $593 | $952 | |
| OR0088 #04 Y:1990 | 04 | 1990 | Recover waste heat from equipment | $1,340 | $1,678 | |
| OR0088 #03 Y:1990 | 03 | 1990 | Install / repair insulation on steam lines | $2,857 | $3,790 | |
| OR0088 #02 Y:1990 | 02 | 1990 | Utilize higher efficiency lamps and/or ballasts | $6,353 | $2,000 | |
| OR0088 #01 Y:1990 | 01 | 1990 | Analyze flue gas for proper air/fuel ratio | $2,047 | $500 |