ITAC Assessment: OR0088
ITAC logo
ITAC Assessment: OR0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CANNED CHILI
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,040 1,265,240
kWh
Natural Gas $121,658 35,431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,936

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,047 $500 - $2,047
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,353 $2,000 $3,373
72,098
kWh
- $2,980
03 2.2136: Install / repair insulation on steam lines $2,857 $3,790 - $2,857
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $1,340 $1,678 $1,340
114,596
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $593 $952 $755
16,120
kWh
- $(-162.0)
06 2.2123: Insulate feedwater tank $745 $1,198 - $745
-
MMBtu
-
07 2.2621: Modify refrigeration system to operate at a lower pressure $344 $600 $344
9,086
kWh
- -
08 2.4133: Use most efficient type of electric motors $198 $392 $198
3,810
kWh
- -
09 2.2414: Use waste heat from hot flue gases to preheat $1,302 $2,837 - $1,302
-
MMBtu
-
TOTAL RECOMMENDED $15,779 $13,947 $6,010
215,710
kWh
$6,951
-
MMBtu
$2,818
TOTAL IMPLEMENTED $9,936 $5,042 $4,326
92,028
kWh
$2,792
-
MMBtu
$2,818
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs