| Assessment Year | 1990 |
|---|---|
| Principal Product | CANNED CHILI |
| NAICS |
n/a
|
| SIC | 2032: Canned Specialties |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 30,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,040 | 1,265,240 |
kWh
|
$0.053 |
| Natural Gas | $121,658 | 35,431 |
MMBtu
|
$3.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,779 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,936 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,047 | $500 | - |
$2,047
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,353 | $2,000 |
$3,373
72,098
kWh
|
- | $2,980 | |
| 03 | 2.2136: Install / repair insulation on steam lines | $2,857 | $3,790 | - |
$2,857
-
MMBtu
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,340 | $1,678 |
$1,340
114,596
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $593 | $952 |
$755
16,120
kWh
|
- | $(-162.0) | |
| 06 | 2.2123: Insulate feedwater tank | $745 | $1,198 | - |
$745
-
MMBtu
|
- | |
| 07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $344 | $600 |
$344
9,086
kWh
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $198 | $392 |
$198
3,810
kWh
|
- | - | |
| 09 | 2.2414: Use waste heat from hot flue gases to preheat | $1,302 | $2,837 | - |
$1,302
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $15,779 | $13,947 |
$6,010
215,710
kWh
|
$6,951
-
MMBtu
|
$2,818 | ||
| TOTAL IMPLEMENTED | $9,936 | $5,042 |
$4,326
92,028
kWh
|
$2,792
-
MMBtu
|
$2,818 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs