Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,990

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned, frozen, and preserved fruits, vegetables, and food specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0419 #05 Y:2009 Utilize higher efficiency lamps and/or ballasts $49,905 $161,162
SD0419 #04 Y:2009 Increase amount of condensate returned $15,940 $2,263
SD0419 #03 Y:2009 Use heat from boiler blowdown to preheat boiler feed water $7,840 $10,000
SD0419 #02 Y:2009 Reduce the pressure of compressed air to the minimum required $12,170 $1,000
SD0419 #01 Y:2009 Install outside air damper / economizer on hvac unit $17,800 $10,000
TT0038 #08 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $5,000 $4,900
TT0038 #07 Y:2009 Use or replace with energy efficient substitutes $2,036 $1,600
TT0038 #06 Y:2009 Insulate glazing, walls, ceilings, and roofs $33,000 -
TT0038 #05 Y:2009 Remove or close off unneeded compressed air lines $2,893 -
TT0038 #04 Y:2009 Use most efficient type of electric motors $839 $1,458
TT0038 #03 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $2,400 $4,170
TT0038 #02 Y:2009 Repair and eliminate steam leaks $21,918 $10,000
TT0038 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $49,940 $140,934
SF0374 #19 Y:2009 Recover and reuse cooling water $23,524 $15,018
SF0374 #18 Y:2009 Use heat from boiler blowdown to preheat boiler feed water $16,622 $86,476
SF0374 #17 Y:2009 Replace hydraulic / pneumatic equipment with electric equipment $89,029 $326,072
SF0374 #16 Y:2009 Utilize higher efficiency lamps and/or ballasts $9,002 $318
SF0374 #15 Y:2009 Analyze flue gas for proper air/fuel ratio $13,809 $31,988
SF0374 #14 Y:2009 Install occupancy sensors $701 $1,567
SF0374 #13 Y:2009 Use optimum size and capacity equipment $2,217 $4,719