Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned, frozen, and preserved fruits, vegetables, and food specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0510 #07 Y:2006 Use most efficient type of electric motors $4,900 $19,200
OR0510 #06 Y:2006 Reduce the pressure of compressed air to the minimum required $1,480 $5,000
OR0510 #05 Y:2006 Install skylights $4,750 $12,400
OR0510 #04 Y:2006 Insulate bare equipment $11,250 $13,600
OR0510 #03 Y:2006 Recover waste heat from equipment $12,200 $35,000
OR0510 #02 Y:2006 Use properly designed and sized hvac equipment $15,000 $11,600
OR0510 #01 Y:2006 Carefully control water level in mass finishing equipment $61,000 $40,000
OR0508 #09 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $1,700 $6,900
OR0508 #08 Y:2006 Upgrade controls on compressors $5,100 $30,000
OR0508 #07 Y:2006 Reduce the pressure of compressed air to the minimum required $3,100 $12,000
OR0508 #06 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $3,200 $3,200
OR0508 #05 Y:2006 Optimize plant power factor $18,300 $31,500
OR0508 #04 Y:2006 Burn a less expensive grade of fuel $375,000 $480,000
OR0508 #03 Y:2006 Install / repair insulation on steam lines $24,700 $5,000
OR0508 #02 Y:2006 Analyze flue gas for proper air/fuel ratio $53,000 $2,000
OR0508 #01 Y:2006 Modify refrigeration system to operate at a lower pressure $69,500 $30,000
OR0491 #08 Y:2005 Optimize plant power factor $650 $1,800
OR0491 #07 Y:2005 Use / purchase optimum sized compressor $7,040 $10,650
OR0491 #06 Y:2005 Install occupancy sensors $2,440 $1,900
OR0491 #05 Y:2005 Install / repair insulation on condensate lines $730 $1,300