ITAC Assessment: OR0508
ITAC logo
ITAC Assessment: OR0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Frozen Fried Potatoes
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 200,000
ft2
Annual Production 140,000
ton
Production Hrs. Annual 6,289
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,518,456 38,084,160
kWh
Electricity Demand $462,474 76,740
kW-mo/yr
Electricity Fees $18,396 -
Natural Gas $2,874,035 326,638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $553,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $69,500 $30,000 $69,500
1,978,400
kWh
- - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $53,000 $2,000 - - - $53,000
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $24,700 $5,000 - - - $24,700
-
MMBtu
04 2.1331: Burn a less expensive grade of fuel $375,000 $480,000 - - - $375,000
-
MMBtu
05 2.3212: Optimize plant power factor $18,300 $31,500 - - $18,300 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,200 $3,200 $2,400
67,000
kWh
$800
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,100 $12,000 $2,200
65,000
kWh
$900
-
kW-mo/yr
- -
08 2.4224: Upgrade controls on compressors $5,100 $30,000 $3,900
109,000
kWh
$1,200
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,700 $6,900 $1,700
50,100
kWh
- - -
TOTAL RECOMMENDED $553,600 $600,600 $79,700
2,269,500
kWh
$2,900
-
kW-mo/yr
$18,300 $452,700
-
MMBtu
TOTAL IMPLEMENTED $158,600 $82,200 $78,000
2,219,400
kWh
$2,900
-
kW-mo/yr
- $77,700
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs