Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned, frozen, and preserved fruits, vegetables, and food specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0393 #05 Y:1992 Insulate bare equipment $574 $1,800
KU0393 #04 Y:1992 Install equipment (eg compactor) to reduce disposal costs $3,913 $14,300
KU0393 #03 Y:1992 Optimize plant power factor $4,164 $11,320
KU0393 #02 Y:1992 Use steam sparging or injections in place of indirect heating $5,295 $6,925
KU0393 #01 Y:1992 Modify refrigeration system to operate at a lower pressure $14,813 $23,600
KU0085 #09 Y:1982 Use minimum steam operating pressure $5,708 -
KU0085 #08 Y:1982 Use heat from boiler blowdown to preheat boiler feed water $6,788 $10,000
KU0085 #07 Y:1982 Analyze flue gas for proper air/fuel ratio $51,359 $2,500
KU0085 #06 Y:1982 Insulate bare equipment $2,958 $4,861
KU0085 #05 Y:1982 Install / repair insulation on steam lines $105,477 $25,000
KU0085 #04 Y:1982 Use hot process fluids to preheat incoming process fluids $13,011 $11,400
KU0085 #03 Y:1982 Install timers and/or thermostats $7,806 $4,800
KU0085 #02 Y:1982 Install vinyl strip / high speed / air curtain doors $14,849 $9,478
KU0085 #01 Y:1982 Utilize higher efficiency lamps and/or ballasts $10,553 $21,306