20
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0746 #12 Y:2007 | 12 | 2007 | Use solar heat to make electricty | $24,000 | $840,000 | |
| OK0746 #11 Y:2007 | 11 | 2007 | Shift from daytime to nighttime operation | $30,387 | $15,000 | |
| OK0746 #10 Y:2007 | 10 | 2007 | Operate boilers on high fire setting | $40,383 | $400 | |
| OK0746 #09 Y:2007 | 09 | 2007 | Operate boilers on high fire setting | $49,382 | $46,200 | |
| OK0746 #08 Y:2007 | 08 | 2007 | Use cooling tower or economizer to replace chiller cooling | $39,725 | $63,500 | |
| OK0746 #07 Y:2007 | 07 | 2007 | Reduce the pressure of compressed air to the minimum required | $9,881 | - | |
| OK0746 #06 Y:2007 | 06 | 2007 | Reduce the pressure of compressed air to the minimum required | $9,881 | $3,256 | |
| OK0746 #05 Y:2007 | 05 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,287 | $3,000 | |
| OK0746 #04 Y:2007 | 04 | 2007 | Install compressor air intakes in coolest locations | $5,580 | $4,541 | |
| OK0746 #03 Y:2007 | 03 | 2007 | Use heat from boiler blowdown to preheat boiler feed water | $52,302 | $14,800 | |
| OK0746 #02 Y:2007 | 02 | 2007 | Use solar heat for heat | $26,050 | $140,000 | |
| OK0746 #01 Y:2007 | 01 | 2007 | Install / repair insulation on steam lines | $32,026 | $30,757 | |
| OK0519 #08 Y:1996 | 08 | 1996 | Utilize higher efficiency lamps and/or ballasts | $115 | $644 | |
| OK0519 #07 Y:1996 | 07 | 1996 | Install compressor air intakes in coolest locations | $467 | $880 | |
| OK0519 #06 Y:1996 | 06 | 1996 | Use other methods for neutralization | $11,000 | $50,000 | |
| OK0519 #05 Y:1996 | 05 | 1996 | Optimize production lot sizes and inventories | - | $119,800 | |
| OK0519 #04 Y:1996 | 04 | 1996 | Use counter-current rinsing to reduce rinse water volume (gravure) | $14,177 | $20,000 | |
| OK0519 #03 Y:1996 | 03 | 1996 | Recover waste heat from equipment | $4,927 | - | |
| OK0519 #02 Y:1996 | 02 | 1996 | Use adjustable frequency drive or multiple speed motors on existing system | $3,853 | $15,000 | |
| OK0519 #01 Y:1996 | 01 | 1996 | Establish burner maintenance schedule for boilers | $178,301 | $18,000 |