ITAC Assessment: OK0519
ITAC logo
ITAC Assessment: OK0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Baby food
NAICS
n/a
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 1,200,000
ft2
Annual Production 480,000,000
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $492,219 25,814,479
kWh
Electricity Demand $220,167 53,477
kW-mo/yr
Electricity Fees $2,520 -
Natural Gas $1,225,268 424,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $212,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $212,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.1231: Establish burner maintenance schedule for boilers $178,301 $18,000 - - $178,301
-
MMBtu
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,853 $15,000 $3,853
163,247
kWh
- - - -
03 2.2437: Recover waste heat from equipment $4,927 - - - $4,927
-
MMBtu
- -
04 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) $14,177 $20,000 - - - $14,177
-
Tgal
-
05 4.321: Optimize production lot sizes and inventories - $119,800 - - - - -
06 3.3113: Use other methods for neutralization $11,000 $50,000 - - - - $11,000
-
gal
07 2.4221: Install compressor air intakes in coolest locations $467 $880 $467
19,637
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $115 $644 $93
3,810
kWh
$22
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $212,840 $224,324 $4,413
186,694
kWh
$22
-
kW-mo/yr
$183,228
-
MMBtu
$14,177
-
Tgal
$11,000
-
gal
TOTAL IMPLEMENTED $212,840 $104,524 $4,413
186,694
kWh
$22
-
kW-mo/yr
$183,228
-
MMBtu
$14,177
-
Tgal
$11,000
-
gal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs