matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2614 #08 Y:2026 | 08 | 2026 | Eliminate or reduce compressed air usage | $474 | $403 |
n/a
|
| UL2614 #07 Y:2026 | 07 | 2026 | Use waste heat from hot flue gases to preheat | $9,873 | $32,500 |
n/a
|
| UL2614 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $15,745 | $220,724 |
n/a
|
| UL2614 #05 Y:2026 | 05 | 2026 | Optimize plant power factor | $3,431 | $7,370 |
n/a
|
| UL2614 #04 Y:2026 | 04 | 2026 | Install / repair insulation on steam lines | $2,638 | $2,392 |
n/a
|
| UL2614 #03 Y:2026 | 03 | 2026 | Use outside cold water source as a supply of cooling water | $13,075 | $57,069 |
n/a
|
| UL2614 #02 Y:2026 | 02 | 2026 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $569 | $350 |
n/a
|
| UL2614 #01 Y:2026 | 01 | 2026 | Utilize higher efficiency lamps and/or ballasts | $292 | $91 |
n/a
|
| GT1009 #07 Y:2026 | 07 | 2026 | Use solar heat to make electricty | $46,591 | $848,967 |
n/a
|
| GT1009 #06 Y:2026 | 06 | 2026 | Use / purchase optimum sized compressor | $10,512 | $45,000 |
n/a
|
| GT1009 #05 Y:2026 | 05 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $421 | $1,050 |
n/a
|
| GT1009 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $2,314 | $5,500 |
n/a
|
| GT1009 #03 Y:2026 | 03 | 2026 | Reduce space conditioning during non-working hours | $2,143 | $1,350 |
n/a
|
| GT1009 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $986 | $300 |
n/a
|
| GT1009 #01 Y:2026 | 01 | 2026 | Apply for tax-free status for energy purchases | $1,430 | $200 |
n/a
|
| SF0650 #06 Y:2026 | 06 | 2026 | Use small number of high output units instead of many small inefficient units | $49,737 | $264,253 |
n/a
|
| SF0650 #05 Y:2026 | 05 | 2026 | Recover waste heat from equipment | $4,412 | $16,375 |
n/a
|
| SF0650 #04 Y:2026 | 04 | 2026 | Change rate schedules or other changes in utility service | $137,573 | $305,377 |
n/a
|
| SF0650 #03 Y:2026 | 03 | 2026 | Use minimum steam operating pressure | $2,009 | $1,080 |
n/a
|
| SF0650 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $6,329 | $160 |
n/a
|