ITAC Assessment: DL0247
ITAC logo
ITAC Assessment: DL0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product frozen packaged meat products
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 38,000
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 4,400
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,887 4,643,962
kWh
Electricity Demand $68,915 10,766
kW-mo/yr
Electricity Fees $2,934 -
Natural Gas $26,843 2,848
MMBtu
Waste Disposal Costs
Water Usage $96,846 5,192
Tgal
TOTAL YEARLY COSTS $532,425
RECOMMENDED SAVINGS* $188,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $350 - $294
4,024
kWh
$56
-
kW-mo/yr
- -
02 2.6231: Utilize controls to operate equipment only when needed $4,382 - $3,677
50,365
kWh
$705
-
kW-mo/yr
- -
03 2.7221: Lower temperature during the winter season and vice-versa $1,671 - $517
7,082
kWh
$99
-
kW-mo/yr
$1,055
-
MMBtu
-
04 2.6213: Turn off steam / hot water lines leading to space heating units $1,592 - - - $1,592
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $399 - $335
4,584
kWh
$64
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $993 - $833
11,417
kWh
$160
-
kW-mo/yr
- -
07 3.4155: Meter waste water $34,580 $145 - - - $34,580
08 2.2622: Replace existing chiller with high efficiency model $27,958 $200,000 $23,459
321,360
kWh
$4,499
-
kW-mo/yr
- -
09 2.2628: Utilize a less expensive cooling method $116,551 $1,000,000 $97,796
1,339,668
kWh
$18,755
-
kW-mo/yr
- -
TOTAL RECOMMENDED $188,476 $1,200,145 $126,911
1,738,500
kWh
$24,338
-
kW-mo/yr
$2,647
-
MMBtu
$34,580
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs