Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,381

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid milk
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2415 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $11,011 $75
UC2415 #05 Y:2024 Optimize plant power factor $32,064 $27,307
UC2415 #04 Y:2024 Use battery storage for demand control $81,652 $611,715
UC2415 #03 Y:2024 Use solar heat to make electricty $109,123 $769,066
UC2415 #02 Y:2024 Pay utility bills on time $5,824 -
UC2415 #01 Y:2024 Apply for tax-free status for energy purchases $78,972 -
LE0580 #07 Y:2024 Use solar heat to heat water $111,555 $686,000
LE0580 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $6,713 $24,500
LE0580 #05 Y:2024 Replace existing hvac unit with high efficiency model $58,861 $112,160
LE0580 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,807 $11,787
LE0580 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $18,743 $17,793
LE0580 #02 Y:2024 Use / purchase optimum sized compressor $51,486 $26,800
LE0580 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,713 $2,350
SF0619 #12 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,993 $16,268
SF0619 #11 Y:2024 Purchase new equipment to reduce material use / cost $52,391 $160,125
SF0619 #10 Y:2024 Install occupancy sensors $292 $785
SF0619 #09 Y:2024 Insulate bare equipment $2,201 $2,875
SF0619 #08 Y:2024 Eliminate or reduce compressed air usage $6,389 $4,926
SF0619 #07 Y:2024 Install steam trap $531,211 $270,719
SF0619 #06 Y:2024 Use closed cycle process to minimize waste water production $90,155 $37,058