ITAC Assessment: UC2415
ITAC logo
ITAC Assessment: UC2415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Milk and cream
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 140
Plant Area 85,000
ft2
Annual Production 22,500,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $966,636 6,543,783
kWh
Electricity Demand $289,088 17,369
kW-mo/yr
Electricity Fees $82,743 -
Natural Gas $759,273 102,203
MMBtu
Waste Disposal Costs
Water Usage $581,129 53,922
Tgal
Water Disposal $1,314,024 43,132
Tgal
TOTAL YEARLY COSTS $3,992,893
RECOMMENDED SAVINGS* $318,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings Primary Product Savings
01 2.8121: Apply for tax-free status for energy purchases $78,972 - - - $78,972 - -
02 2.8123: Pay utility bills on time $5,824 - - - $5,824 - -
03 2.9114: Use solar heat to make electricty $109,123 $769,066 $119,347
808,037
kWh
- - $(-10,224.0) -
04 2.3141: Use battery storage for demand control $81,652 $611,715 $(-111.8)
(-757)
kWh
$1,764
-
kW-mo/yr
- - $80,000
05 2.3212: Optimize plant power factor $32,064 $27,307 - $32,064
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $11,011 $75 $9,539
64,581
kWh
$1,472
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $318,646 $1,408,163 $128,774
871,861
kWh
$35,300
-
kW-mo/yr
$84,796 $(-10,224.0) $80,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs