Assessment Year | 2024 |
---|---|
Principal Product | Milk and cream |
NAICS | 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $100 M to 500M |
# of Employees | 140 |
Plant Area |
85,000
ft2
|
Annual Production | 22,500,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $966,636 | 6,543,783 |
kWh
|
$0.15 | |
Electricity Demand | $289,088 | 17,369 |
kW-mo/yr
|
$16.64 | |
Electricity Fees | $82,743 | - |
|
- | |
Natural Gas | $759,273 | 102,203 |
MMBtu
|
$7.43 | |
Waste Disposal Costs | |||||
Water Usage | $581,129 | 53,922 |
Tgal
|
$10.78 | |
Water Disposal | $1,314,024 | 43,132 |
Tgal
|
$30.47 | |
TOTAL YEARLY COSTS | $3,992,893 | ||||
RECOMMENDED SAVINGS* | $318,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $78,972 | - | - | - | $78,972 | - | - | |
02 | 2.8123: Pay utility bills on time | $5,824 | - | - | - | $5,824 | - | - | |
03 | 2.9114: Use solar heat to make electricty | $109,123 | $769,066 |
$119,347
808,037
kWh
|
- | - | $(-10,224.0) | - | |
04 | 2.3141: Use battery storage for demand control | $81,652 | $611,715 |
$(-111.8)
(-757)
kWh
|
$1,764
-
kW-mo/yr
|
- | - | $80,000 | |
05 | 2.3212: Optimize plant power factor | $32,064 | $27,307 | - |
$32,064
-
kW-mo/yr
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $11,011 | $75 |
$9,539
64,581
kWh
|
$1,472
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $318,646 | $1,408,163 |
$128,774
871,861
kWh
|
$35,300
-
kW-mo/yr
|
$84,796 | $(-10,224.0) | $80,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs